CHIEF ENGINEER Unit 15 Periodical Dry Docking

  1. With reference to the periodical dry-docking of a vessel:
    (a) state FIVE items of information that may be obtained from a docking plan;(5)
    (b) state FIVE services that must be made available in order to maintain the safety of the vessel.(5)

CHIEF ENGINEER Unit 15 Periodical Dry Docking Q1

CHIEF ENGINEER Unit 15 Q1

  1. With reference to the periodical dry-docking of a vessel:
    (a) list SIX items of information that could be obtained from a docking plan;(6)
    list FOUR conditions to be met prior to dry-docking a vessel.(4)

CHIEF ENGINEER Unit 15 Periodical Dry Docking Q2

CHIEF ENGINEER Unit 15 Q2

  1. With reference to the periodical dry-docking of a vessel:
    (a) list FIVE precautions that should be undertaken before the vessel enters the dock;(5)
    (b) list FIVE inspections/precautions that should be undertaken before re-flooding the dock.(5)

CHIEF ENGINEER Unit 15 Periodical Dry Docking Q3

CHIEF ENGINEER Unit 15 Q3

  1. With reference to the periodical routine dry-docking of a vessel:
    (a) state FOUR reasons for dry-docking;
    (b) outline THREE methods of testing a hull for watertight integrity.

CHIEF ENGINEER Unit 15 Periodical Dry Docking Q4

CHIEF ENGINEER Unit 15 Q4