CHIEF ENGINEER Unit 15 Q1

0

CHIEF ENGINEER Unit 15 Q1

1 / 10

Which aspect of underwater equipment is typically detailed in a docking plan?

2 / 10

In preparation for docking, why is information about hull shape provided on the docking plan?

3 / 10

Which of the following pieces of information is typically found on a vessel’s docking plan?

4 / 10

Which service is necessary to address potential injuries or health emergencies during dry-docking?

5 / 10

Which of the following is a critical service that must be available during dry-docking to ensure fire safety?

6 / 10

What service is essential to maintain environmental control and safety for crew members during dry-docking?

7 / 10

What structural details of a vessel does a docking plan provide to ensure proper alignment on docking blocks?

8 / 10

What type of lighting is necessary during dry-docking to ensure safe operations?

9 / 10

Why is the location of through-hull fittings noted on the docking plan?

10 / 10

Why must there be arrangements for bilge and ballast water disposal during dry-docking?

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Most Voted
Newest Oldest
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x