CHIEF ENGINEER Unit 15 Q2

0

CHIEF ENGINEER Unit 15 Q2

1 / 10

Which of the following would be detailed in a docking plan to indicate the location of vital underwater components?

2 / 10

Why must all ballast water be managed prior to dry-docking?

3 / 10

Which of the following information is essential in a vessel’s docking plan for accurate placement of the support blocks?

4 / 10

What is a critical condition to verify regarding cargo before dry-docking a vessel?

5 / 10

Which aspect of the docking plan helps determine the height at which the vessel should be lifted in dry dock?

6 / 10

In addition to structural details, what other component is often included in the docking plan to aid safety and inspection?

7 / 10

What verification is required for the stability of the vessel prior to dry-docking?

8 / 10

What information on the docking plan is crucial for assessing potential stress points on the hull during dry-docking?

9 / 10

Why would the docking plan include information about the positioning of bilge blocks?

10 / 10

Which of the following is an essential safety check for crew and equipment before dry-docking?

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Most Voted
Newest Oldest
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x