CHIEF ENGINEER Unit 15 Periodical Dry Docking Q2

  1. With reference to the periodical dry-docking of a vessel:
    (a) list SIX items of information that could be obtained from a docking plan;(6)
    (b) list FOUR conditions to be met prior to dry-docking a vessel.(4)

Items of information that could be obtained from a docking plan

Conditions to be met prior to dry-docking a vessel.