
- With reference to transverse watertight bulkheads, state EACH of the following:
(a) FOUR reasons why these are an important part of the vessel’s structure;(4)
(b) the positions of each of the FOUR most important watertight bulkheads;(4)
(c) the reason why the foremost continuous bulkhead is of a stronger construction.(2)
CHIEF ENGINEER Unit 19 Bulkheads Q1

- With reference to watertight bulkheads:
(a) state FOUR reasons why these are an important part of the vessel’s structure;(4)
(b) state the precautions that are necessary to avoid accidents with power operated watertight doors.(6)
CHIEF ENGINEER Unit 19 Bulkheads Q2

- (a) Write standing orders detailing the procedures to be followed in the event of a severe flooding incident within the machinery spaces.(6)
(b) List the positions of the four main watertight bulkheads on a typical vessel.(4)
Lesson 1 Firestop Fundamentals
https://www.youtube.com/watch?v=Ud6J6mitHmk
Lesson 2 Firestop Through Penetrations
https://www.youtube.com/watch?v=axPWxrvp4Tw
Lesson 3 Firestop High Traffic Openings
https://www.youtube.com/watch?v=p5vOUTVrD9I
Lesson 4 Firestop HVAC Ducts
https://www.youtube.com/watch?v=7w3YGuaMPRk
Lesson 5 Firestop Construction Joints
https://www.youtube.com/watch?v=5jb28lrLgJQ
Lesson 6 Inspecting Firestop for Compliance
https://www.youtube.com/watch?v=_-t8GIbIsH4