Hotel Service Unit 4 Watch Responsibilities

  1. Describe the method of testing EACH of the following:
    (a) a bilge high level alarm switch;(3)
    (b) a diesel engine cooling water high temperature alarm probe;(3)
    (c) an oil mist detector.(4)

Hotel Service Unit 4 Q1

Hotel Service Unit 4 Q1 Quiz

Answer

State the action to be taken by the watch keeping engineer in the event of EACH of the following:
(a) flooding;(6)
(b) failure of main propulsion machinery. (4)

Hotel Service Unit 4 Q2

Hotel Service Unit 4 Q2 Quiz

Answer


List FIVE statutory items that the relieving officer shall be informed of by the officer in charge of the engineering watch prior to taking over the engineering watch. (10)

Hotel Service Unit 4 Q3

Hotel Service Unit 4 Q3 Quiz

Answer

  1. Describe the responsibilities of the off-going duty engineer with respect to EACH of the following:
    (a) fuel service tanks;(2)
    (b) oily water separator;(2)
    (c) potable water tanks;(2)
    (d) machinery space defect book;(2)
    (e) main engine sump level.(2)

Hotel Service Unit 4 Q4

Hotel Service Unit 4 Q4 Quiz

Answer

0 0 votes
Article Rating
Subscribe
Notify of
guest
1 Comment
Most Voted
Newest Oldest
Inline Feedbacks
View all comments
James G
David
6 months ago
1
0
Would love your thoughts, please comment.x
()
x