CHIEF ENGINEER Unit 12 Q2

0

CHIEF ENGINEER Unit 12 Q2

1 / 10

Which piece of machinery involved in electrical power generation is included in a continuous survey?

2 / 10

Why is the inspection of compressors included in a continuous survey of machinery?

3 / 10

Which of these systems, essential for fuel handling, would be included in a continuous survey?

4 / 10

Which auxiliary machinery would likely be inspected as part of a continuous survey?

5 / 10

What is the primary purpose of a continuous survey of machinery on a vessel?

6 / 10

Which of the following is commonly inspected during a continuous survey of machinery?

7 / 10

How does a continuous survey of machinery benefit vessel operations?

8 / 10

Over what period does the continuous survey of machinery typically take place?

9 / 10

Which of the following best describes the inspection frequency under a continuous survey of machinery?

10 / 10

Which of the following machinery used in the vessel’s cooling systems is part of the continuous survey?