CHIEF ENGINEER Unit 10 Q1

0

CHIEF ENGINEER Unit 10 Q1

1 / 10

Which of the following is commonly listed as a part of a Permit to Work in machinery spaces?

2 / 10

Which information is essential in a Permit to Work within the machinery spaces of a vessel?

3 / 10

Which of the following should be recorded in a Permit to Work for a machinery task?

4 / 10

Which of the following is a condition that must be met before a Permit to Work can be issued?

5 / 10

Before a Permit to Work is issued, which of the following checks is required?

6 / 10

What is an essential condition regarding authorization before issuing a Permit to Work?

7 / 10

Which of the following must be confirmed before a Permit to Work is issued in a machinery space?

8 / 10

For how long does a Permit to Work typically remain in force outside of workshop areas?

9 / 10

What information regarding isolation of machinery is essential in a Permit to Work?

10 / 10

When does a Permit to Work need to be reissued?