Hotel Service Unit 3 Q1

  1. (a) State, with reasons, where the watch should be handed over on a vessel fitted with a UMS system, where the period of duty is 24 hours.(2)
    (b) Outline the responsibility of the duty engineer with respect to EACH of the following:
    (i) the Systems Status Board;(3)
    (ii) the Oil Record Book;(3)
    (iii) the main and auxiliary Machinery Maintenance Record Book.(2)

What is a UMS system?

Describe where the watch should be handed over on a vessel fitted with a UMS system, where the period of duty is 24 hours.

What is the Systems Status Board?

What is the Oil Record Book?

What is the main and auxiliary Machinery Maintenance Record Book

Responsibility of the duty engineer with respect to the Systems Status Board

Responsibility of the duty engineer with respect to the Oil Record Book

Responsibility of the duty engineer with respect to the main and auxiliary Machinery Maintenance Record Book