2. Actions to Take in the Event of Main Propulsion Machinery Failure
Question:
What is the first action the watchkeeping engineer should take in the event of a failure of the main propulsion machinery?
1. Handing Over the Watch on a UMS Vessel
Question:
Where should the watch be handed over on a vessel fitted with a UMS (Unattended Machinery Space) system, where the period of duty is 24 hours?
Which of the following should the watchkeeping engineer check after notifying the bridge about flooding in the engine room?
Which of the following is NOT a necessary precaution for personnel entering an unmanned machinery space?
5. Statutory Information Regarding Machinery Failures
Question:
Why must the officer in charge inform the relieving officer about any recent machinery failures or abnormalities?
1. Importance of Visiting Machinery Spaces Regularly
Question:
Why should machinery spaces in a vessel fitted with a UMS (Unmanned Machinery Space) system be visited regularly?
1. Actions to Take in the Event of Flooding
Question:
What is the first action the watchkeeping engineer should take in the event of flooding in the engine room?
6. Oil Mist Detector Reset
Question:
After testing an oil mist detector, what must be confirmed for proper operation?
3. Responsibility for the Oil Record Book
Question:
What is the duty engineer’s responsibility with respect to the Oil Record Book?
2. Using Human Senses in Machinery Spaces
Question:
How can human senses be used to monitor conditions in a machinery space?
3. Potable Water Tanks
Question:
What is the duty engineer’s responsibility concerning potable water tanks before handing over the watch?
5. Testing an Oil Mist Detector
Question:
What is the correct method to test an oil mist detector?
3. Testing a Diesel Engine Cooling Water High-Temperature Alarm Probe
Question:
How should a diesel engine cooling water high-temperature alarm probe be tested?
What is an important factor to consider during the investigation of a main propulsion machinery failure?
2. Oily Water Separator
Question:
What should the off-going duty engineer do with respect to the oily water separator?
3. Definition of Machinery Space
Question:
What is the definition of a "Machinery Space" on a vessel?
Which of the following does NOT fall under the definition of "Machinery Space"?
3. Statutory Information Regarding Fuel and Lubrication
Question:
Why must the officer in charge inform the relieving officer about the levels of fuel and lubricants?
Which of the following notices would NOT typically be posted at the entrance to an unmanned machinery space?
2. Statutory Information Regarding Safety Devices
Question:
Which safety-related information must be provided to the relieving officer before taking over the watch?
4. Validating the Alarm Probe Function
Question:
What is an important verification step after testing the high-temperature alarm probe?
4. Responsibility for the Machinery Maintenance Record Book
Question:
What is the duty engineer’s responsibility with respect to the main and auxiliary Machinery Maintenance Record Book?
1. Fuel Service Tanks
Question:
What is the responsibility of the off-going duty engineer with respect to fuel service tanks?
4. Safety Checks Before Entry into a Machinery Space
Question:
What should be done before entering a machinery space outside normal hours to ensure safety?
5. Main Engine Sump Level
Question:
What should the off-going duty engineer check regarding the main engine sump level?
In case of severe flooding that cannot be controlled, what should the watchkeeping engineer do?
4. Machinery Space Defect Book
Question:
What is the responsibility of the off-going duty engineer regarding the machinery space defect book?
4. Statutory Information Regarding Planned Maintenance
Question:
What information about planned maintenance must be provided to the relieving officer?
After notifying the bridge of a main propulsion machinery failure, what is the next step the watchkeeping engineer should take?
1. Precautions for Personnel Safety
Question:
Which of the following precautions should be taken to ensure the safety of personnel entering a remote unmanned machinery space?
2. Responsibility for the Systems Status Board
Question:
What is the duty engineer’s responsibility with respect to the Systems Status Board?
3. Procedure for Entering Machinery Space Outside Normal Hours
Question:
What is the correct procedure for entering an unmanned machinery space outside normal working hours?
2. Notices Posted at the Entrance of Unmanned Machinery Spaces
Question:
Which of the following notices should be posted at the entrance of an unmanned machinery space?
1. Statutory Information Regarding Machinery Status
Question:
Which of the following is a statutory item that the relieving officer must be informed of before taking over the engineering watch?
2. Monitoring Alarm Activation
Question:
When testing a bilge high-level alarm switch, what is an essential step after the alarm activates?
1. Testing a Bilge High-Level Alarm Switch
Question:
What is the recommended method of testing a bilge high-level alarm switch?