Hotel Service Unit 4 Watch Responsibilities Q2 – Answer

State the action to be taken by the watch keeping engineer in the event of EACH of the following:
(a) flooding;(6)
(b) failure of main propulsion machinery. (4)

(a) Flooding (6 marks)

Actions by the watchkeeping engineer:

  1. Raise the alarm immediately – inform bridge/master and engine control room.
  2. Identify source of flooding (sea inlet, pump, pipeline, stern gland, tank, etc.).
  3. Isolate the leak where possible (shut valves, stop pumps, use emergency bilge suction).
  4. Start bilge pumps or emergency fire/bilge pump to control water ingress.
  5. Take safety precautions – secure electrical equipment in flooded area to avoid electric shock/fire risk.
  6. Report situation continuously to bridge/master and assist with damage control measures (closing watertight doors, preparing for possible abandonment if uncontrolled).

(b) Failure of main propulsion machinery (4 marks)

Actions by the watchkeeping engineer:

Keep bridge/master updated on progress, estimated time to restore propulsion, and any limitations.

Inform bridge immediately – so navigational action can be taken.

Identify cause – check alarms, gauges, trip indications, and machinery condition (fuel, lube oil, cooling, scavenge air, governor, etc.).

Take corrective action – attempt restart or bring standby machinery online if possible.