CHIEF ENGINEER Unit 16 Q2

0

CHIEF ENGINEER Unit 16 Q2

1 / 9

What final inspection should be conducted regarding the dock’s pumping and dewatering system before flooding?

2 / 9

Why is it necessary to confirm that all hull openings, such as sea chests and valves, are properly secured before flooding?

3 / 9

What action should be taken regarding scaffolding and tools in the dry dock before flooding?

4 / 9

Which of the following should be checked before flooding a dry dock?

5 / 9

What must be inspected to prevent water leakage into the dry dock during flooding?

6 / 9

Why should electrical power to dock lighting and equipment in the dry dock be secured before flooding?

7 / 9

Who is responsible for signing the authority for a Flood Certificate before flooding a dry dock?

8 / 9

What should be the last action taken before initiating the flooding of the dry dock?

9 / 9

Before flooding, which system on the vessel should be tested to ensure functionality in case of emergencies?