CHIEF ENGINEER Unit 16 Q1

0

CHIEF ENGINEER Unit 16 Q1

1 / 7

What is one key way to reduce the risk associated with the critical period?

2 / 7

What is meant by the "critical period" when a vessel is settling onto dock blocks?

3 / 7

What additional measure can help ensure a safe transfer of weight during the critical period?

4 / 7

Which of the following structural risks is increased during the critical period of dry-docking?

5 / 7

Why must docking personnel be especially vigilant during the critical period?

6 / 7

Why is the critical period considered dangerous for the vessel’s structure?

7 / 7

During the critical period, why is it essential to control the vessel’s descent onto the blocks carefully?