CHIEF ENGINEER Unit 3 Q3

0

CHIEF ENGINEER Unit 3 Q3

1 / 10

Which record-keeping measure is required after testing the emergency generator?

2 / 10

What is the first step in the routine testing of an emergency generator according to MCA guidance?

3 / 10

Which system component must be inspected to ensure smooth startup of the emergency generator?

4 / 10

What is one of the final steps after completing the emergency generator test?

5 / 10

What should be inspected once the generator is running under load?

6 / 10

Which of the following is checked while the emergency generator is running under load?

7 / 10

After starting, how long should the emergency generator typically be run during routine testing?

8 / 10

Which of the following actions should be taken to simulate a blackout condition during emergency generator testing?

9 / 10

What should be done if any abnormalities are observed during the emergency generator test?

10 / 10

How often should the emergency generator be tested under load according to MCA guidelines?

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Most Voted
Newest Oldest
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x